Sunnyside Bath Remodel

The first phase of this project was to remodel an existing small, and barely usable bathroom. The existing bathroom was completely gutted, and turned into a ¾ bath, with a much more spacious and useable shower. Existing out of plum walls made tile installation challenging, but in the end, tile from the Cement Tile Shop really made this unique, but with a touch of traditional flare bathroom pop!